TES Multiphase Measurement designs
and builds Chemical injection skids and customizes system
packages to meet individual customer requirement. Our systems
design and assembly with the latest technology in controlled
volume metering pumps that provide precision dosing at a
variety of flows and pressures.
TES Multiphase Measurement also do
engineering, Programing and design for instrumentation and
control package to meet customer requirement such as
Project |
Types of Packages / Equipment |
End User / Customer |
Year |
Pearl Oil Jasmine C Project |
Chemical Injection Package |
CUEL Limited |
2006 |
Jasmine Pearl B Project |
Chemical Injection Package |
CUEL Limited |
2006 |
Pearl Jasmine B Platform Project |
Biocide Chemical Injection Package |
CUEL Limited |
2006 |
Arthit Wellhead Platform Project-1B Project |
Corrosion Inhibitor Pump Package |
Thai Nippon Steel Engineering and Construction Corporation Limited |
2006 |
Pearl Oil Jasmine - B2 Project |
Chemical Injection Package |
CUEL Limited |
2007 |
Pearl Oil Jasmine - B2 Project |
Closed Drain Pumps Package |
CUEL Limited |
2007 |
Jasmine Project Phase D |
Chemical Injection Package |
CUEL Limited |
2007 |
Jasmine Project Phase Ban Yen A |
Chemical Injection Package |
CUEL Limited |
2007 |
Jasmine Project Phase D Project |
Closed Drain Pumps Package |
CUEL Limited |
2007 |
Jasmine Project Phase Ban Yen A Project |
Closed Drain Pumps Package |
CUEL Limited |
2007 |
PA-293 PACPP Open Drain Modification Project |
Corrosion Inhibitor Pump Package |
Chevron Offshore Thailand Company Limited |
2007 |
1001 GFI-SOCO Bualuang Block B8-38 Project |
Scale Inhibitor Injection Package |
ARV Offshore Company Limited |
2007 |
1001 GFI-SOCO Bualuang Block B8-38 Project |
Opened Drain Pump Package |
ARV Offshore Company Limited |
2007 |
1001 GFI-SOCO Bualuang Block B8-38 Project |
Closed Drain Pump Package |
ARV Offshore Company Limited |
2007 |
1001 GFI-SOCO Bualuang Block B8-38 Project |
Scale Inhibitor Injection Package |
ARV Offshore Company Limited |
2008 |
HOE0701V Sun Well Head Platform Project |
Fuel Gas Start-up Heater Package |
CUEL Limited |
2008 |
HOEC PY-1 Gas Field Development Project |
Relief Scrubber Pump Package |
CUEL Limited |
2008 |
NP-144 BPCPP Open Drain System Modification Project |
Chemical Injection Pump Package |
Chevron Thailand Company Limited |
2008 |
RJWA Compression Project |
Corrosion Inhibitor Chemical Injection Pump Package |
Chevron Offshore Thailand Company Limited |
2008 |
BG Hydra Project |
CCVT Fuel Gas Treatment Package |
BG Exploration and Production India Limited |
2008 |
BEWC Upgrade Project |
Instrument and Utility Air Package |
Chevron Offshore Thailand Company Limited |
2008 |
Hydra Brownfield - Panna Processing Platform Project |
Diaphragm Type Reciprocating Pump Package |
BG Exploration and Production India Limited |
2009 |
NJWA Project |
Instrument Air Compressor Trial Package |
Chevron Thailand Company Limited |
2009 |
Arthit Wellhead Platform Phase 1C |
Opened Drain Pump Package |
CUEL Limited |
2009 |
Arthit Wellhead Platform Phase 1C |
Closed Drain Pump Package |
CUEL Limited |
2009 |